WE PROVIDE TURN-KEY SOLUTIONS

951-520-6275

Give us a call

Blog

Learn more

Careers

Learn more

Resources

Learn more
  • DIRECTIONAL BORING
  • SAW CUTTING
  • LINE LOCATING
  • UTILITY POTHOLING
  • TRENCHING
  • HYDRO-EXCAVATION TRENCHING
  • CONCRETE & ASPHALT PATCHING

We provide turn-key solutions

At Subsurface Solutions, we offer a comprehensive range of subsurface prep services including horizontal directional boring, utility potholing, hydro-excavation, trenching, and other services. Our team possesses the resources and expertise required to manage any subsurface project from start to finish. We pride ourselves on delivering a high level of professionalism and a diverse array of solutions, ensuring each project is completed successfully, on time, and within budget. Subsurface Solutions is part of Edison Electric, a full-service electrical contractor..

Horizontal Directional Drilling

We use a hydro-excavation method for daylighting conflicting utilities. This method allows for minimal site disruption as it minimizes large spoil piles, large steel plates, and large street patches.

We core drill an 8″ diameter hole and hydro-excavate to expose the utility. All utilities are cleared to each customer’s request or to 12″ below the proposed bore depth. Restoration consists of the hole being backfilled with sand and compacted and the original core being reinstalled and concreted in place.

All potholed utilities will be documented and numbered with a rough image of a sketch of the job site, proposed bore, or trench line. Each utility will indicate soil conditions utility type, top and bottom depth, as well as thickness of concrete or asphalt at each location

Utility potholing

We use a hydro-excavation method for daylighting conflicting utilities. This method allows
for minimal site disruption as it minimizes large spoil piles, large steel plates, and large
street patches.
We core drill an 8” diameter hole and hydro-excavate to expose the utility. All utilities are
cleared to each customer’s request or to 12” below the proposed bore depth.
Restoration consists of the hole being backfilled with sand and compacted and the original
core being reinstalled and concreted in place.
All potholed utilities will be documented and numbered with a rough image of or sketch
of the job site, proposed bore, or trench line. Each utility will indicate soil conditions, utility
type, top and bottom depth, as well as thickness of concrete or asphalt at each location.

Testimonials

Sed aliquet magna odi. Ut et ex in lorem volutpat malesuada. Sed egestas dui eget imperdiet tempor. Nullam nec diam enim. Nunc non dui eleifend, sagittis dolor sed, consequat ante. Sed vel ligula gravida, elementum dui ac, rhoncus odi.

Client Sub Surface

Client

Sed aliquet magna odi. Ut et ex in lorem volutpat malesuada. Sed egestas dui eget imperdiet tempor. Nullam nec diam enim. Nunc non dui eleifend, sagittis dolor sed, consequat ante. Sed vel ligula gravida, elementum dui ac, rhoncus odi.

Test Sub Surface

Client

Sed aliquet magna odio. Ut et ex in lorem volutpat malesuada. Sed egestas dui eget imperdiet tempor. Nullam nec diam enim. Nunc non dui eleifend, sagittis dolor sed, consequat ante. Sed vel ligula gravida, elementum dui ac, rhoncus odi.

Placeholder Client

Client